You don't have javascript enabled. Good luck with that.
Pencarian
Dinas SDA Lakukan Pembangunan Waduk Marunda Tahap III

Rp 55 B Prepared for Construction of Marunda Reservoir Phase III

The Jakarta Water Resources Agency (SDA) is about to execute further construction of the Marunda Reservoir (Phase III) on the coast of Jakarta.

We plan to build a 39-hectare-wide reservoir to overcome flooding in this area

Its construction aims to overcome flooding in the Marunda Polder area with a catchment area as wide as 2,882 hectares.

SDA Agency's Data and Information Center (Pusdatin) Head, Nugraharyadi said the scope of work for the construction of the Marunda Reservoir Phase III included construction work on a reservoir embankment of approximately 765 meters and landscaping of Zones 2A and 2B covering a 3.9-hectare-wide land.

City Prepares Centralized Domestic Wastewater Management System

"We plan to build a 39-hectare-wide reservoir to overcome flooding in this area, including area arrangement for public and green open spaces covering an area of 26 hectares," he expressed, Wednesday (1/17).

He added the Marunda Reservoir construction would then await land acquisition, which was currently in the process of extending the location determination.

"To realize it, we'll spend a budget amounting to Rp 55 billion," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye613 personTiyo Surya Sakti
  3. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  4. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye368 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close