You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran di Lingkungan Semper Barat Diperlebar

Water Channel Constructed in Kebon Baru Metros

Cilincing Sub-district's Water Resource Implementer Unit, North Jakarta, is constructing water channel at RW 10 of Kebon Baru Metros, Semper Barat Urban Village, Cilincing Sub-district, North Jakarta.

to add the channel capacity

Nandi Yantoro, the Coordinator, said the construction is aimed to replace existing pipe channel.

"The construction also responses local resident's request to add the channel capacity," he said, Wednesday (1/17).

E. Jakarta Prepares Strategy to Anticipate Rainy Season

According to him, the construction has been started since January 15, 2024 and is targeted to complete in 45 days. 

"The channel depth will be 45 centimeters with 40 meters of lenght," he added.

Meanwhile, RW 10 Head, Epriyanto, admitted the area was often inundated during heavy rain. That is why new channel is needed.

"I sent report since early January. A week later, there was personnel checked the location. Now the construction is already running," he stated.

He thanked and appreciated the North Jakarta Water Resources Sub-agency for responding the report fast.

"It is hoped the channel will eliminate inundation. We also appeal local resident to take care the channel well," he closed.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye836 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye614 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye581 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye563 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye463 personFolmer