You don't have javascript enabled. Good luck with that.
Pencarian
PPSU Bantu Kembalikan Kotak Suara ke Tingkat Kecamatan
.
photo Istimewa - Beritajakarta.id

PPSU Rawa Terate Returns Ballot Box to Logistic Warehouse

The personnel of Rawa Terate Urban Village PPSU, Cakung, East Jakarta assisted the return of ballot box and ballot from 85 polling stations to election logistic warehouse at PIK Flat, Penggilingan, Thursday (2/15).

PPSU personnel assist to return the ballot box from polling station to the warehouse

Rawa Terate Urban Village Secretary, Daniel Wisnu Parulian, admitted the personnel started to return the logistics from 1 AM to 9.30 AM this morning. Those 85 polling stations have completed the counting.

30 Participants to Take Part in Betawi Dance Training in West Jakarta

According to him, the two special polling stations are additional stations for resident living at two clusters in Sedayu Sport Center. Those are polling station 901 with 165 voters and polling station 902 with 234 voters.

"PPSU personnel assist to return the ballot box from polling station to the warehouse," he said.

Meanwhile, Cakung Sub-district Head, Fajar Eko Satrio admitted the returning of ballot box and ballot from seven urban villages have been completed.

He stated that the voting counting for sub-district level will be started tomorrow, Friday (2/16) starting from 8 AM at PIK Penggilingan Flat.

"The counting did not run today since the personnel need to take a rest. There is also consolidation from KPPS to divide the task. The counting is open for public and will be escorted by joint personnel of army/police, Satpol PP and so on," he explained.

Linked News
Popular News indeks
  1. Transjakarta Wins Popular Company Award in Land Transportation Sector

    access_time04-09-2024 remove_red_eye1005 personAldi Geri Lumban Tobing
  2. PPKUKM Agency Encourages Digital Transaction for Fostered MSMEs

    access_time04-09-2024 remove_red_eye907 personFolmer
  3. Transportation Agency Urges Mass Participants to Use Public Transportation

    access_time03-09-2024 remove_red_eye851 personAldi Geri Lumban Tobing
  4. Jakarta LRT Phase 1B Construction Achieves Positive Deviation of 26.64 Percent

    access_time06-09-2024 remove_red_eye848 personAldi Geri Lumban Tobing
  5. Transjakarta Prepares Parking Area and Additional Fleet for Grand Mass

    access_time05-09-2024 remove_red_eye761 personAldi Geri Lumban Tobing