You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Pedestrian Jadi Usulan Prioritas Kecamatan Kebayoran Lama

200 Proposals of Kebayoran Lama Sub-district Taken to City Level

Kebayoran Lama Sub-district's Musrenbang Plenary Session decided that 200 proposals to be taken to South Jakarta City level.

We carry out in-depth discussions and evaluations

Kebayoran Lama Sub-district Head, Iwan K Santoso, said there were 283 proposals from all urban villages. But 83 proposals can not be realized.

51 Musrenbang Proposals to Be Discussed at Regency Level

"We carry out in-depth discussions and evaluations of all proposals. Then, we determine the priority," he said, Wednesday (3/6).

Iwan added that mostly the residents' aspiration are still for physical construction such as road repair, public street light and up to water channel dredging.

"There are also sidewalk construction proposal on Jalan Ciputat Raya and Jalan Sultan Iskandar Muda. Hopefully these proposals can be realized," he added.

Meanwhile, RW 01 Head, Grogol Utara Urban Village, Hairul, hopes the proposals can be realized next year.

"We have delivered our request. Hopefully the government is able to realize it," he hoped.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye707 personBudhi Firmansyah Surapati
  2. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye666 personDessy Suciati
  3. Jakarta to Develop Its First Mangrove Botanical Garden

    access_time06-11-2026 remove_red_eye665 personDessy Suciati
  4. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye632 personNurito
  5. Kampung Rambutan 1 Reservoir to Combine Flood Control with Public Recreation

    access_time06-11-2026 remove_red_eye629 personAldi Geri Lumban Tobing