You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan JPO Marunda Terus Dikebut
.
photo Anita Karyati - Beritajakarta.id

Marunda Pedestrian Bridge Repair to Complete May 2024

The repair of Marunda Pedestrian Bridge, North Jakarta which was hit by a truck on Saturday (4/16), is targeted to complete next month.

was newly launched last year

North Jakarta Bina Marga Sub-agency Head, Ilham Raya, said the repair is under Jakarta Bina Marga's City Utility and Facility Division.

Bina Marga to Build Four JPOs with Modern Feel This Year

"The repair has been running by third parties. Some of the materials are being ordered," he said, Thursday (4/18).

He added that the company owns truck container commits to take responsibility of this matter.

"The pedestrian bridge was newly launched last year. It is hoped the repair can run smoothly," he added.

Meanwhile, Jakarta Bina Marga's City Utility and Facility Development Section Head, Semporanto Pandopotan Marpaung, stated the pedestrian bridge has length 22.6 meters.

"The incident did not give impact to bridge structure," he stated.

Meanwhile, one of Cilincing Urban Village residents, Asmi (33), admitted the bridge assists her much to cross the road safely.

"The bridge is important for children or students to cross the road safely," she stated.

Linked News
Popular News indeks
  1. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye736 personAnita Karyati
  2. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye498 personTP Moan Simanjuntak
  3. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye425 personAldi Geri Lumban Tobing
  4. East Jakarta Sudinhub Replaces 38 Broken Convex Traffic Mirrors

    access_time26-04-2024 remove_red_eye371 personNurito
  5. 81 Pets in West Jakarta Get Anti Rabies Vaccine

    access_time26-04-2024 remove_red_eye365 personTP Moan Simanjuntak