You don't have javascript enabled. Good luck with that.
Pencarian
Progres Pembangunan Waduk Rawa Malang Capai 75 Persen

July 2024, Construction of Rawa Malang Reservoir in Semper Timur Completed

The development of the embung (artificial lake) and Rawa Malang Reservoir in Semper Timur Urban Village, Cilincing, North Jakarta continues to be accelerated. Thus far, the work progress has touched 75 percent.

It is targeted for completion in July 2024

The reservoir is located between the Cibitung - Cilincing Toll Road, precisely on Jalan Cakung Drainase, Kampung Sawah, RT 10/RW 01.

Jakarta Water Resources Agency (SDA)'s Flood Control Sub-Group Chair, Ericson Indra Pulungan stated the embung and reservoir that have a width of 4.5 hectares was capable of accommodating around 80 million liters of water.

Bojong Indah Reservoir's Plaster Improved

"This reservoir construction has been started since August 2023, to minimize flooding that often hits RW 10 and 01, Semper Timur Urban Village," he expressed, Tuesday (4/23).

He explained it is expected to reduce the load on the Gendong Cakung River Drain and the Bulak Cabe Pump.

The reservoir will be used as a retention pond equipped with embankment piles, inspection roads, sluice gates, and two pumps with 2.5 cubic meters per second capacity.

"It is targeted for completion in July 2024," he said.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye755 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye736 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye667 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye579 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye555 personAldi Geri Lumban Tobing