You don't have javascript enabled. Good luck with that.
Pencarian
Progres Pembangunan Waduk Rawa Malang Capai 75 Persen

July 2024, Construction of Rawa Malang Reservoir in Semper Timur Completed

The development of the embung (artificial lake) and Rawa Malang Reservoir in Semper Timur Urban Village, Cilincing, North Jakarta continues to be accelerated. Thus far, the work progress has touched 75 percent.

It is targeted for completion in July 2024

The reservoir is located between the Cibitung - Cilincing Toll Road, precisely on Jalan Cakung Drainase, Kampung Sawah, RT 10/RW 01.

Jakarta Water Resources Agency (SDA)'s Flood Control Sub-Group Chair, Ericson Indra Pulungan stated the embung and reservoir that have a width of 4.5 hectares was capable of accommodating around 80 million liters of water.

Bojong Indah Reservoir's Plaster Improved

"This reservoir construction has been started since August 2023, to minimize flooding that often hits RW 10 and 01, Semper Timur Urban Village," he expressed, Tuesday (4/23).

He explained it is expected to reduce the load on the Gendong Cakung River Drain and the Bulak Cabe Pump.

The reservoir will be used as a retention pond equipped with embankment piles, inspection roads, sluice gates, and two pumps with 2.5 cubic meters per second capacity.

"It is targeted for completion in July 2024," he said.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye801 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye539 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye505 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye424 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye414 personAnita Karyati