You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Akan Revitalisasi Tahap 2 Embung Pekayon dan Waduk Kaja
....
photo Nurito - Beritajakarta.id

Revitalization of Pekayon Embung and Kaja Reservoir Resumed

Revitalization of the Pekayon Embung (Artificial Lake) and Kaja Reservoir will be a priority scale for the East Jakarta Water Resources Sub-agency (SDA)'s work program this year.

The work will still be the same in the second stage

Drainage Development and Improvement Section Head, Tengku Saugi Zikri explained the revitalization of the Pekayon Embung this year is the second stage, continuing work at the end of 2023, namely the construction of sheet pile walls around the Embung as long as 750 meters with a height of 2.5 meters. There is a fishing area or cantilever at six points. The sheet pile is built using grass box material, which is installed at an angle on the banks of the Embung.

"The work will still be the same in the second stage. That is building the unfinished perimeter sheet pile and other work," he expressed, Tuesday (2/20).

Water Channel on Jalan Pinang Kalijati Revitalized

This Pekayon Embung has a land area of 1.6 hectares. However, what was built for the wet section is around 1.4 hectares. The rest is for jogging track areas, inspection roads, and tree planting.

"Jogging track will be built in stage. Last year, it was built on the west side for 200 meters using stamp concrete material," he explained.

Then this year, personnel would also revitalize the Kaja Reservoir, Ciracas.

This reservoir was built in 2018 by the Jakarta SDA  Agency. The work has a naturalized concept, where the sheet pile construction does not use concrete but river stone. The cliff was planted with grass and trees on top.

Its management was handed over to the East Jakarta SDA Sub-agency in January 2021. Besides preventing flooding, it also functions as a green open space (RTH), which is planted with various types of protective and productive trees and is equipped with a jogging track area.

Pekayon Urban Village Head, Mesrarianita added since the existence of the Pekayon Embung, several locations in his area are no longer flooded when it rains, such as RT 08, 09, and 12/RW 02, as well as RT 10/03.

"Surely, its existence helps overcome flooding in the surrounding environment," she closed.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1204 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1046 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye900 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye726 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye565 personDessy Suciati