You don't have javascript enabled. Good luck with that.
Pencarian
 Satgas Biru Perbaiki Turap Kali Utan Kayu
.
photo Nurito - Beritajakarta.id

June 2024, Collapsed Sheet Pile Repairs at Utan Kayu River Completed

Repairs to collapsed sheet pile at the Utan Kayu River, Jalan Pengayoman, Utan Kayu Utara, Matraman, East Jakarta are targeted for completion in the forthcoming June 2024. It has been since May 9, 2024.

Everything went smoothly because the weather was sunny

Matraman Sub-district SDA Executing Unit, Inge Sukma Yupicha said the sheet pile as long as 12 meters with four meters high was collapsed after being eroded by heavy water.

"16 personnel have been sent to the location. The initial condition had many holes, thus when it was eroded by high water discharge it immediately collapsed," she stated, Monday (5/13).

Jalan YRS III Repairs in South Jakarta Completed

Matraman Sub-district SDA Task Force Coordinator, Saeful added the repairs used river stone material covered with Dolken wood for support to make it stronger.

"Everything went smoothly because the weather was sunny," he stated.

Linked News
Popular News indeks
  1. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye1002 personAldi Geri Lumban Tobing
  2. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye844 personBudhi Firmansyah Surapati
  3. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye790 personAldi Geri Lumban Tobing
  4. Voting at 1,542 Polling Stations in C. Jakarta Runs Smoothly

    access_time27-11-2024 remove_red_eye742 personBudhi Firmansyah Surapati
  5. Commission A Agrees on 2025 Draft Regional Budget for Working Partners of Rp 14 Trillion

    access_time22-11-2024 remove_red_eye554 personDessy Suciati