You don't have javascript enabled. Good luck with that.
Pencarian
PAM Jaya Lakukan Peremajaan Alat IPA Buaran
....
photo Istimewa - Beritajakarta.id

PAM Jaya Rejuvenates IPA Buaran Equipment

Perumda PAM Jaya rejuvenates Buaran Water Treatment Plant (IPA) in order to increase equipment reliability and maximum raw water absorption.

PAM JAYA strives to increase the clean water production capacity

The rejuvenation is aimed to upgrade outdated or less efficient equipment to ensure smoother and more sustainable operations such as replacing or repairing existing electrical equipment.

Senior Manager Corporate Communication & Office Director, Gatra Vaganza, said it is hoped that this equipment rejuvenation can increase the reliability and safety of the electrical system at Buaran WTP, reduce the risk of disruption or damage that could hamper production, and increase production capacity.

DWP Perumda PAM Jaya Assists Stunting Handling in South Jakarta

"PAM JAYA strives to increase the clean water production capacity at the Buaran WTP, so that it can meet the increasing clean water needs of the community," Gatra said, Sunday (6/2).

As for information, PAM JAYA carried out two main works, namely replacing coarse screens which were 32 years old and replacing fine screens which were 10 years old in the two raw water intake canals of the Buaran Water Treatment Plant which were carried out alternately 14 hours each to avoid total blackouts.

Apart from that, PAM Jaya also replaced the 20 kV incoming panels and 3.3 kV outgoing panels which were more than 15 years old, with some parts being outdated or discontinuous.

During the coarse and fine screen replacement work, he added, the water will continue to flow but the pressure will decrease.

"When replacing the coarse and fine screens, the canal conditions are dry so the raw water will decrease by around 1,100 liters per second. Screen installation is carried out alternately," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye541 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing