Area Arrangement on Jalan Galunggung Cengkareng Timur Completed
access_time June 07 2024 08:52 PM remove_red_eye 392
Reported by TP Moan Simanjuntak | Translated by Rizky Mawardi
Reported by TP Moan Simanjuntak | Translated by Rizky Mawardi
Cengkareng Timur Urban Village has completed the prime area arrangement periods April-June 2024 on Jalan Galunggung, RT 01/15.
Now it looks fresh and nice
Cengkareng Timur Urban Village, Boy Raya Purba, said the arrangement is run above 3.5 meter x 150 meter of land.
"Now the arrangement on Jalan Galunggung RT 01/15 has been completed," he said, Friday (6/7).
Next Week, Sheet Pile Repairs on Jalan Petojo Enclek XIV CompletedBoy added that arrangements include planting various types of ornamental plants, productive trees, making water lines, and replacing damaged canteens with new ones.
"With the arrangement, the area is now clean, neat and green. We also ask residents to maintain it well," he added.
Meanwhile, Rafael Sudarsono (58), one of local residents, responding positively about the area arrangement run by Cengkareng Timur Urban Village.
"Previously, the area was slum and dirty. Now it looks fresh and nice," he admitted.