You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Kawasan TW 2 di Jalan Galunggung Cengtim Rampung

Area Arrangement on Jalan Galunggung Cengkareng Timur Completed

Cengkareng Timur Urban Village has completed the prime area arrangement periods April-June 2024 on Jalan Galunggung, RT 01/15.

Now it looks fresh and nice

Cengkareng Timur Urban Village, Boy Raya Purba, said the arrangement is run above 3.5 meter x 150 meter of land.

"Now the arrangement on Jalan Galunggung RT 01/15 has been completed," he said, Friday (6/7).

Next Week, Sheet Pile Repairs on Jalan Petojo Enclek XIV Completed

Boy added that arrangements include planting various types of ornamental plants, productive trees, making water lines, and replacing damaged canteens with new ones.

"With the arrangement, the area is now clean, neat and green. We also ask residents to maintain it well," he added.

Meanwhile, Rafael Sudarsono (58), one of local residents, responding positively about the area arrangement run by Cengkareng Timur Urban Village.

"Previously, the area was slum and dirty. Now it looks fresh and nice," he admitted.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1382 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1012 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye841 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye649 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye632 personAldi Geri Lumban Tobing