You don't have javascript enabled. Good luck with that.
Pencarian
 Anwar Tinjau Pembangunan Waduk di Cipayung
.
photo Nurito - Beritajakarta.id

Anwar Inspects Reservoir Construction in Cipayung

East Jakarta Mayor, Muhammad Anwar inspected the construction of a reservoir in the Cipayung Sub-district area, Tuesday (6/25). He came riding a bicycle with his staff.

This is very important for water absorption and storage and solutions for handling inundation

The first location visited was the construction of Bangkong 1 and 2 reservoirs on Jalan Masjid 3, RW 06, Cipayung. This five-meter-deep reservoir with a wet cross-sectional area of ​​around 5,000 square meters was built to accommodate 40,000 cubic meters of water.

"Hopefully, it can handle inundation as high as 5 cm in the area," he expressed.

Construction of Mandor Hasan Reservoir Begins

He then inspected the construction of a reservoir on Jalan Mandor Hasan 1 Bambu Apus, Cipayung. The reservoir, called Black Bamboo Reservoir, covers an area of ​​approximately 2.2 hectares. However, the wet area used is around 5,000 square meters. This reservoir would be used to overcome inundation in the surrounding area.

"This is very important for water absorption and storage and solutions for handling inundation," he asserted.

Later on, there would be a park around the reservoir for the convenience of residents in interacting and as a tourist destination.

Cipayung Sub-district SDA Executing Unit Head, Dian Kartika added the construction of Bangkong 1 and 2 reservoirs on Jalan Masjid 3 has currently progressed to around 60 percent. Meanwhile, on Jalan Mandor Hasan 1, the work has only reached around 10 percent.

"It is targeted to be completed in the upcoming December," she stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1221 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye931 personDessy Suciati
  4. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye911 personAldi Geri Lumban Tobing
  5. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer