You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Banjir dan Genangan, Pemkot Jaksel Kebut Pembangunan Saluran

Channel Construction in South Jakarta Keeps Being Accelerated

The arrangement of the drainage system to overcome inundation and flooding in South Jakarta keeps being maintained.

We'll build eight new channels

South Jakarta Water Resources (SDA) Sub-agency Head, Santo said that, as many as 17 channels would soon be built in several flood-prone areas.

"Nine are still under construction and two of them have been completed. After this, we'll build eight new channels in the near future. In total, there are 17 channels," he expressed, Friday (6/28).

New Channel Built on Jalan Jembatan Dua Barat

The work has been ongoing since April 2024 ans is targeted for completion in the upcoming November 2024.

Then there were two channel constructions that had been completed, namely on Jalan Menteng Wadas and Jalan Menteng Atas RW 06, Setiabudi Sub-district.

"Meanwhile, what will be completed in the near future is the construction of the channel in Menteng Atas, RW 01, which has reached 94 percent," he explained.

He admitted that it would have an impact on traffic jams, such as the channel construction project using drilling or jacking methods on Jalan Prof Dr Satrio, Tebet, South Jakarta.

Nevertheless, before the work, his party had socialized it to residents and road users, either through environmental administrators or banners along the road.

To speed up it, personnel closed one lane of the road in coordination with the South Jakarta Transportation Sub-agency.

"Hopefully, it can be finished on time, becauae now we have entered the jacking or drilling stage to speed up the installation of the box culvert channel concrete," he said.1

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1026 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye983 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye942 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye717 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye614 personAnita Karyati