You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran di Gang Alfalah Rawasari

August, Channels Normalization in Gg Alfalah Rawasari Completed

The water channels normalization located in Gg Alfalah, Jalan Pramuka Sari 1, RT 10/08, Rawasari Urban Village, Cempaka Putih, which has been ongoing since Wednesday (6/12) last week, is targeted to be completed in August.

Every day, we send 15 personnel to finish it in the upcoming August

Cempaka Putih Sub-district Water Resources (SDA) Excuting Unit Head, Subandi said normalization was conducted by building a new channel which is 40 centimeters wide and 30 centimeters high. It was done because some channels were closed so they malfunctioned.

"This is done because many parts are covered with mud," he expressed, Wednesday (6/19).

Water Channel on Jalan Asrama Dinas Kebersihan Normalized

He explained the work was focused on two sides of channels with a total length of 270 meters.

"Every day, we send 15 personnel to finish it in the upcoming August," he asserted.

The work above received appreciation from one of the residents in RW 08 Rawasari Urban Village, Ari (36). He stated, if it was not normalized, it would trigger flooding in the rainy season.

"Hopefully, it can be completed as soon as possible," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye357 personAldi Geri Lumban Tobing
close