You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakpus Kuras Sistem Drainase Kawasan Istana Negara

Channel on Jalan Medan Merdeka Utara Dredged

The Central Jakarta Water Resources Sub-agency (SDA), dredged a water channel on Jalan Medan Merdeka Utara, RT 05/02, Gambir ahead of Independence Day's 79th anniversary.

In total, we have managed to collect six cubic meters of mud

Central Jakarta SDA Sub-agency Head, Mustajab said the dredging is conducted to maximize the function of the channel in accommodating rainwater.

"We send 20 personnel to dredge the mud and trash in the channel," he said, Monday (8/5).

Water Channel on Jalan Ancol Barat III Dredged

Gambir Sub-district Executing Unit Head, M Imawan explained the dredging was taken to 300 meters.

"Alhamdulillah (thank God), the channel is not fully strewn with mud and the work process only takes one day," he explained.

He added the channel has 1.2 meters wide with two meters high. The work has been ongoing since Sunday (8/4) morning to afternoon.

"In total, we have managed to collect six cubic meters of mud," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1367 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1033 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye958 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye771 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye734 personAldi Geri Lumban Tobing