You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran di Jalan Kramat Bunder Rampung

Channel Dredging on Jalan Kramat Bunder Dredged from Mud

As many as 33.6 cubic meters of mud are dredged from the channel on Jalan Kramat Bunder, RW 01, Kramat Urban Village, Senen.

If it is not done, it will trigger flooding in the rainy season

Senen Sub-district SDA Executing Unit Head, Zulfahmi Baco expressed the dredging is a routine agenda to anticipate blockages and flooding.

"If it is not done, it will trigger flooding in the rainy season," he said, Thursday (6/27).

Mud Dredging at Sepat Park Retention Pool Accelerated

He explained the work involved 12 personnel started in May 13, 2024. The channel itself has a width and a length of 207 meters with 80 centimeters long.

"The thickness of the channel mud has reached 20 centimeters. Currently, the work is complete already," he explained.

The work received appreciation from one of the residents from RW 01 Kramat Urban Village, Ari.

"If it is not dredged, the overflowing channel water won't only inundate the road, but also the surrounding residential areas," he closed.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5571 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye923 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye827 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye808 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye753 personBudhi Firmansyah Surapati