You don't have javascript enabled. Good luck with that.
Pencarian
Pagar di Jl Raya Bogor Diperbaiki

Green Belt Fence on Jalan Raya Bogor Repaired

The East Jakarta Parks and City Forest Sub-agency, repaired a fence dividing the green belt on Jalan Raya Bogor, Rambutan Urban Village, Ciracas, which was damaged and intentionally removed due to the construction of the Kali Baru sheet pile.

The total length of the fence to be installed is 30 meters

According to Djauhar Arifin, Head of East Jakarta Parks and City Forest Sub-agency, many fences had been deliberately removed to allow access for heavy equipment in order to smoothen the construction.

There was also a fence that was damaged due to frequent flooding of the river which carried waste material and overflowed onto Jalan Raya Bogor.

Arrangement of Cengkareng Timur Outer Ring Road Area Completed

"We reinstalled the fence on the side of Jalan Raya Bogor so that it looks neat. Its installation was started since Monday (9/30) and the target is to finish today," he expressed, Thursday (10/3).

"The total length of the fence to be installed is 30 meters with a height of 1.8 meters," he continued.

Ciracas Sub-district Parks and City Forest Executing Unit Head, Hani Hartini added the work involved six personnel using welding equipment.

"Crane unit was also prepared at the location to help the installation process. Because the fence is long and heavy, it must be helped to be lifted using the crane," she concluded.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye519 personDessy Suciati
  2. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye514 personAldi Geri Lumban Tobing
  3. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye496 personFolmer
  4. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye490 personNurito
  5. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye485 personAldi Geri Lumban Tobing