You don't have javascript enabled. Good luck with that.
Pencarian
Progres Pembangunan Sodetan ke Waduk Muara Angke Capai 80 Persen
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Diversion Channel Construction to Muara Angke Reservoir Reaches 80 Percent

North Jakarta Water Resource Sub-agency keeps intensifying diversion channel on Jalan Pengolahan Hasil Perikanan Tradisional (PHPT), RW 01, Pluit, Penjaringan.

construction reaches 80 percent

The diversion channel connects micro channel in surrounding area heading to longstorage of Muara Angke Reservoir.

Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

Penjaringan Sub-district Water Resource Implementer Unit Head, Pendi, said the diversion channel construction aims to speed up water flow in surrounding area into Muara Angke Reservoir. Then the water in reservoir can be pumped into the sea.

"It is our effort to overcome tidal flood. Catching area is up to RW 22, Pluit which is impacted by the tidal flood," he said, Thursday (11/21).

Pendi explained that the construction of this diversion channel is planned to be carried out at three points with a length of around 56 meters. The diversion channel with culvert box material has a width of 1.2 meters and a height of around 1 meter.

"The construction has been starting since Monday (11/18) by involving 36 personnel," he explained.

Pendi added the personnel also cleaning the channel starting from RW 22, 11 and up to diversion channel in RW 01, Pluit by 700 meters. His side also deploys two mini excavators and breakers to speed up the work.

He admitted another diversion channel construction has been also prepared around the location. The work will be run in stages.

"The diversion channel construction reaches 80 percent. Hopefully it can be completed tomorrow and continued to another location," he admitted.

Pluit Urban Village Head, Ahmad Faizal appreciated the diversion channel construction to overcome tidal flood.

"By flowing the water to reservoir, it can be pumped out to the sea. So the tidal flood will recede quickly," he said.

Linked News
Popular News indeks
  1. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye593 personFolmer
  2. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye591 personDessy Suciati
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye431 personAldi Geri Lumban Tobing
  4. Residents Hope Another Free Homecoming Program Held Next Year

    access_time27-03-2025 remove_red_eye316 personDessy Suciati
  5. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye290 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik