You don't have javascript enabled. Good luck with that.
Pencarian
Sudinhub Jaksel Tindak Belasan Kendaraan Parkir Liar di Tiga Ruas Jalan

Illegaly Parked Vehicles in Kebayoran Baru Controlled

South Jakarta Transportation Sub-agency controlled illegal parking on three different roads in Kebayoran Baru Sub-district. As the result, 13 vehicles were netted.

give deterrent effect

South Jakarta Transportation Sub-agency Head, Bernard Octavianus Pasaribu, said the controlling run on Monday (1/20) was held on Jalan Senopati, Jalan Gunawarman, and Jalan Wolter Monginsidi.

Jakarta Provincial Government Controls Illegal Parking on Sidewalk of Jalan Wolter Monginsidi

"We controlled the vehicles to guarantee the public facility users' right especially pedestrian," he said, Tuesday (1/21).

Bernard detailed nine motorcycles were flattened, one motorcycle and two cars were ticketed, and one car was towed.

"The sanctions were given to give deterrent effect for owners for not parking their vehicles illegally," he added.

During the controlling, 50 joint personnel of Transportation Sub-agency, Satpol PP, Army and Police were involved.

"Not only giving sanction, personnel also conducting socialization for reesidents related to sanctions if they violate parking regulation," he continued.

Moreover, South Jakarta Transportation Sub-agency's Operational Handling, Ebenezer Tobing explained the joint personnel controlled valet parking officer who used sidewalk as parking area.

"The vehicles were towed and Satpol PP gave letter of warning for valet parking company," he stated.

Linked News
Popular News indeks
  1. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1159 personFolmer
  2. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1045 personNurito
  3. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye979 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye926 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye772 personAldi Geri Lumban Tobing