You don't have javascript enabled. Good luck with that.
Pencarian
 Dua Saluran Air di Tanah Abang Dikuras Atasi Genangan

Tanah Abang Blue Taskforce Dredge Channel in Two Locations

The Blue Taskforce personnel of Central Jakarta Water Resources Sub-agency dredged water channel on Jalan Dukuh Pinggir and Jalan Mutiara 1 RT 07/04 Bendungan Hilir Urban Village, Tanah Abang.

20-30 cm mud were dredged from the channel

Tanah Abang Water Resource Implementer Unit Head, Eli Menawan Sari said the channel dredging is aimed to optimize the channel in handling the inundation during heavy rain.

"20-30 cm mud were dredged from the channel," she said, Wednesday (4/16).

Two Channels Undergo Normalization in Tanah Abang

Eli explained water channel on Jalan Dukuh Pinggir 1 size is 40 cm of height and width along 450 meters. Then on Jalan Mutiara RT 08/04 is 60 cm of width and 80 cm of height.

"We deployed four taskforce personnel for each location," she added.

The work progress on Jalan Dukuh Pinggir 1 has reached 85 percent, then on Jalan Mutiara RT 07/04 progress is 10 percent.

"It is targeted to complete by the end of this month," she stated.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye583 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye556 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye454 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye449 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye423 personDessy Suciati