You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan crossing saluran di Pulo Gebang oleh Pasukan Biru SDA

Crossing channel Built on Jalan Jati Raya to Prevent Flooding

Some 12 personnel from the Cakung Sub-district Water Resources Executing Unit (SDA), East Jakarta, deployed to construct a channel crossing on Jalan Jati Raya, RT 01/14, Pulo Gebang Urban Village.

Hopefully, it can minimize flooding when it rains

"This work has been underway since September 24, 2025, and is targeted for completion in the upcoming October 2025," said Cakung Sub-district SDA Executing Unit Head, Dian Nur Cahyono, Friday (9/26).

He explained, the crossing channel is being built using a U-ditch measuring 60x60x120 centimeters.

August, Crossing Channel Development in Gading Kirana Completed

"The work progress has touched around 15 percent," he explained.

According to him, the previous channel conditions experienced many landslides, leading to flooding due to blockages.

The crossing channel construction received appreciation from one of the locals, Lukman (41).

"Hopefully, it can minimize flooding when it rains," he hoped.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye784 personBudhi Firmansyah Surapati
  2. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye681 personAldi Geri Lumban Tobing
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye586 personAldi Geri Lumban Tobing
  4. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye531 personBudhi Firmansyah Surapati
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye484 personAldi Geri Lumban Tobing