You don't have javascript enabled. Good luck with that.
Pencarian
Kondisi saluran air baru di Gang Sabar setelah pengerjaan selesai

Channel Built in Gang Sabar to Effectively Prevent Flooding

Residents appreciate the new water channel construction in Gang Sabar, RW 04, Jagakarsa Sub-district, South Jakarta.

This is an effective step in dealing with floods

One of the residents, Ahmad Rizal, expressed his thanks and appreciation for the construction of the new channel to address flooding.

"This is an effective step in dealing with floods," he expressed, Monday (10/6).

Revitalization of Water Channel on Jalan Kramat Almost Complete

South Jakarta Water Resources Sub-agency (SDA)'s Development Section Head, Horas Yosua stated, there are two channel sizes with a length of 480 meters built since July 2024. They are 370 meters using U-ditch 40 HD and 110 meters with U-ditch 60 HD.

"Hope the construction can be completed soon. And the locals will take care of this channel by not littering randomly," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye631 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye570 personAldi Geri Lumban Tobing
  3. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye442 personDessy Suciati
  4. Two Bronto Skylifts Deployed to Evacuate Residents from Pavilion Apartment Fire

    access_time04-09-2026 remove_red_eye337 personFolmer
  5. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye307 personAldi Geri Lumban Tobing