You don't have javascript enabled. Good luck with that.
Pencarian
Kondisi saluran air baru di Gang Sabar setelah pengerjaan selesai

Channel Built in Gang Sabar to Effectively Prevent Flooding

Residents appreciate the new water channel construction in Gang Sabar, RW 04, Jagakarsa Sub-district, South Jakarta.

This is an effective step in dealing with floods

One of the residents, Ahmad Rizal, expressed his thanks and appreciation for the construction of the new channel to address flooding.

"This is an effective step in dealing with floods," he expressed, Monday (10/6).

Revitalization of Water Channel on Jalan Kramat Almost Complete

South Jakarta Water Resources Sub-agency (SDA)'s Development Section Head, Horas Yosua stated, there are two channel sizes with a length of 480 meters built since July 2024. They are 370 meters using U-ditch 40 HD and 110 meters with U-ditch 60 HD.

"Hope the construction can be completed soon. And the locals will take care of this channel by not littering randomly," he hoped.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye634 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye494 personAldi Geri Lumban Tobing
  3. Jakarta Calls on Residents to Save Energy with 60-Minute Lights-Off Action

    access_time19-09-2026 remove_red_eye435 personAldi Geri Lumban Tobing
  4. South Jakarta BPBD Distributes 44,000 Liters of Clean Water

    access_time19-09-2026 remove_red_eye371 personTiyo Surya Sakti
  5. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye322 personFolmer