You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan jalan rusak di Jakarta Pusat

Central Jakarta Public Works Patched 1,017 Potholes

The Central Jakarta Public Works patched 1,017 potholes during January 1-26, 2026 in eight districts.

1,439 square meters

Head of the sub-agency, M Soleh said the repairs were carried out by 85 yellow troop personnel in eight districts plus 18 personnel from the city level.

10,329 Damaged Roads in North Jakarta Have Been Repaired

"The total area is approximately 1,439 square meters," he said, Monday (1/26).

He added that improvements were made based on the results of field monitoring and reports of complaints from residents submitted via social media channels.

He admitted that the high intensity rainfall that occurred last week resulted in many potholes on the roads.

"Our personnel go around in patrol cars to patch potholes using asphalt," he admitted.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye929 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye683 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye669 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye576 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye561 personFakhrizal Fakhri