You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Sungai dan Waduk Dipercepat
.
photo istimewa - Beritajakarta.id

Dredging Work of Rivers & Reservoirs Accelerated

Although it is still dry season, the city administration keeps vigorously accelerating the dredging work of rivers, reservoirs and water channels that spread in Jakarta. Additionally, all malfunctioned pump machines also being repaired.

Dry season is the right time to conduct dredging optimally

August, 14 Connecting Channels and 2 Dams in East Jakarta Dredged

Jakarta Vice Governor, Djarot Saiful Hidayat said the dredging work of rivers, reservoirs, and water channels is carried out as an anticipation strategy of flood threat during rainy season.

Dry season is the right time to conduct dredging optimally. It must be done deeply to accommodate more water,” he said, on the sidelines of City Spatial and Urbanization Coordination Meeting in West Jakarta Mayor Office, Thursday (7/28).

Djarot furthered Jakarta Water Management Department is going to send all heavy equipments to conduct dredging in the upcoming August. “It aims to deepen the capacity of macro and micro water channels in the five regions of the capital, "he said

Former of Blitar Mayor also instructed all mayors to build a biopori holes in prone-flood areas. “Biopori holes construction is the right way to minimize flood,” he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye344 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye312 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik