You don't have javascript enabled. Good luck with that.
Pencarian
Stasiun Pompa Pasar Ikan Siap Hadapi Banjir

Pasar Ikan Pump Station Ready to Face Flood

Pasar Ikan Pump Station that located at Jalan Krapu, Ancol Urban Village, Pademangan, North Jakarta, is in good condition and ready to anticipate flood in the capital.

There are 6 big pipes with a capacity of 5 cubic per second and 4 small pipes with 250 liter per second

Pasar Ikan Pump Station Operator, Paulus Silalahi said the pump that also be functioned as a trash filter has 10 drainpipes that toward the sea.

"There are 6 big pipes with a capacity of 5 cubic per second and 4 small pipes with 250 liter per second," he stated, Monday (8/24).

A Sheet Pile will Be Built in Kampung Pulo

He explained it is the ring one to anticipate flood in accordance with SOP which reaches 458 hectares. Hence, his side and officer must be on standby 24 hours. 

It is used to suck water from Ciliwung Rivulet and Besar River toward Pluit Reservoir.

"The point is its existence cutting water flow from both rivers and diverted to Pluit Reservoir for minimizing water volume," he explained.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1636 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1460 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1325 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1101 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye984 personDessy Suciati