You don't have javascript enabled. Good luck with that.
Pencarian
 Akses Masuk Jalan Otistas III Akan Ditutup Selama 18 Hari
.
photo Ilustrasi - Beritajakarta.id

Jalan Otista III will be Closed 18 Days

Jalan Otista III, precisely in Cipinang Cempedak Urban Village, Jatinegara, East Jakarta, will be closed for 18 days on Saturday (9/12). The closure is applied to smoothen the construction of Ciliwung River waterway pipe towards East Flood Canal (KBT).

As planned, the closure will be done on September 12-30

To prevent traffic congestion, police will apply road diversion on some roads. They are motorists from Jalan Otista Raya towards Jalan Otista III will be rerouted to Jalan Kebon Nanas Utara, Jalan Kebon Nanas II-Jalan Kebon Nanas Utara III-Jalan Panti Asuhan and back to Jalan Otista III.

City Secretary Reviewed Ciliwung-KBT Waterway Project

While motorists from Jalan DI Panjaitan towards Jalan Otista III will be rerouted to Jalan Kebon Nanas Selatan I-Jalan Kebon Nanas Selatan and back to Jalan Otista III.

Jatinegara Sub-District Head, Budi Setiawan stated the closure on Jalan Otista III is slated to be applied on Saturday (9/12) until Wednesday (9/30). It relates to drill bit lifting by PT Wijaya Karya as project executor.

As planned, the closure will be done on September 12-30,” he told, Wednesday (9/9).

He added that the drill lifting is a series of two waterways' outlet pipe. Later on, the pipe serves to flow water from Ciliwung River to Cipinang River before emptying into East Flood Canal.

“Technically, we’re still discussing this matter with Mayor,” he closed.

Linked News
Popular News indeks
  1. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  2. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye781 personFolmer
  3. Jakarta Aeromodelling Team Grabs First Gold Medal

    access_time16-09-2024 remove_red_eye556 personAldi Geri Lumban Tobing
  4. Area Arrangement on Jalan Kramat to Complete this Weekend

    access_time17-09-2024 remove_red_eye428 personTiyo Surya Sakti
  5. Area Arrangement on Jalan Setapak Reaches 95 Percent

    access_time14-09-2024 remove_red_eye364 personTiyo Surya Sakti