You don't have javascript enabled. Good luck with that.
Pencarian
 Walikota Jakbar : Pengesahan Terlambat, Penyerapan Anggaran Rendah
.
photo Folmer - Beritajakarta.id

Physical Project Auction in W. Jakarta Complete

West Jakarta Mayor, Anas Effendi stated that one of the causes of low budget absorption is because of late ratification.

It is just the implementation and the rests are still in auction process

"2015 budget in West Jakarta was just ratified in May ago. Besides that, other requirements related to the budget should be fulfilled first. For example, total renovation. In beginning step is eliminating building first. It can't be demolished without eliminating," he explained, Thursday (9/10).

According to him, the auction process of most physical development projects in West Jakarta that budget through 2015 City Budget (APBD) is complete. "It is just the implementation and the rests are still in auction process," he uttered.

West Jakarta Mayor: We Will Work Maximally

As known, the budget absorption this year is Rp 131.88 billion or 27.08 percent of the total budget amounted to Rp 487.01 billion.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye866 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye346 personAldi Geri Lumban Tobing
close