You don't have javascript enabled. Good luck with that.
Pencarian
Jl Raya Kalimalang Minim PJU
.
photo Nurito - Beritajakarta.id

Kalimalang Inspection Road Needs Lighting

Jalan Raya Kalimalang, East Jakarta is lacking street light. As a result, the connecting road of Jakarta and Bekasi are dark.

Why they don’t install any lamps here, its dark, dangerous

 

Relaying on Beritajakarta.com observation, there are a number of dark spots ranging from Pangkalan Jati intersection up to Duren Sawit Sector Police Headquarter. The dark itself is seen along 800 meters long road.

City to Install 2,500 Smart PJUs In the Upcoming November

 

This condition can harm motorist at night. Whereas along the inspection road is experiencing severe damage by many holes and bumpy roads. “Why they don’t install any lamps here, its dark, dangerous,” said Faisal (34), one of motorists, Friday (10/16).

 

Regarding the matter, Head of East Jakarta Industry and Energy, Saukhani said since the bidding process is currently being carried out. It is expected street light would have installed in next week.

 

"We’re working on it. It is expected that as soon as the lights installed in Kalimalang PJU. But I still know nothing about its exact amount," he disclosed.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1526 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye945 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye477 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye434 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye413 personFolmer