You don't have javascript enabled. Good luck with that.
Pencarian
Kalimalang Keruh, Pasokan Air Baku PAM Terganggu
.
photo Nurito - Beritajakarta.id

Water in Kalimalang Turns Black Hampering Water Supply

PT Aetra must decrease the water production capacity since the water in Kalimalang, East Jakarta turns black.

The rain at upstream area brought sediment and waste to Cileungsi, Cikarang and Bekasi rivers

Pratama S. Adi, company's secretary, admited that the production at Buaran Water Processing Instalation (IPA), East Jakarta is decreasing.

"The rain at upstream area brought sediment and waste to Cileungsi, Cikarang and Bekasi rivers," he said, Tuesday (11/3).

Kalimalang Inspection Road Needs Lighting

Water production at Buaran IPA is only 4,500 liter per second, while the target is 5,600 liter per second. At Pulogadung IPA, the production is 3,400 liter per second out of target 3,800 liter per second.

The residents should not worry because the water supply still meets the standard based on Health Ministry Regulation No. 492/Menkes/PER/IV/2010. Bad raw water condition always happens in early rainy season.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye528 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye471 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye414 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye316 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye281 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik