You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Ciliwung Mulai Terlihat Hasilnya

Normalization of Ciliwung River Runs Well

Ciliwung normalization program, in Kampung Pulo, Kampung Melayu, Jatinegara, East Jakarta, continues to speed up. Some workers using heavy equipment are still busy putting plaster on the river bank.

This normalization project runs well so far

Mayor of East Jakarta, Bambang Musyawardana disclosed there is no obstacle in normalization program of Ciliwung River. "Considering, the buildings standing on the dried trace for inspection road had been demolished," he stated, when he reviewed the normalization in the field, Wednesday (11/4).

He ensured, the situation in Kampung Pulo is very conducive in line with there is the central government's program in construction of road inspection and river normalization.

Channel Normalization Along Jalan Dwi Warna Raya Stagnated

He added that his party would instruct East Jakarta Park and Cemetery Sub-Department to plant trees on the roadside. "This normalization project runs well so far," he finished.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5425 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4581 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1775 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye997 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye955 personAldi Geri Lumban Tobing