You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jl Perintis Kemerdekaan Dinormalisasi

Water Channel Along Jl Perintis Kemerdekaan Normalized

The water channel along Jalan Perintis kemerdekaan, Kayu Putih, Pulogadung, East Jakarta, was normalized. The effort was done to anticipate the rainy season.

The channel was not dredged for 2 years. We also deepen the channel into 1-1.5 meter

Based on Beritajakarta.com's observation, the workers used simple tools to clean the channel. The mud taken from the channel put into the sack and placed on the sidewalk to get dry.

East Jakarta Head Sub-dept. of Water Management, Ahmad Yazied Bustomi, said the length of the channel is 1 kilometer and width is 80-100 centimeter.

November, Mampang River Normalized

"The channel was not dredged for 2 years. We also deepen the channel into 1-1.5 meter," he said.

The project is targeted to be done before December ends.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1578 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1437 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati