You don't have javascript enabled. Good luck with that.
Pencarian
Rusun DKI Bakal Ramah Penyandang Disabilitas

City Began to Touch Flat for Middle Class

The city administration began to touch the flat construction for middle-class people in the capital. 

Flat construction was been scheduled, we hope there is subsidy from the government considering we also need cost for maintaining the flat

According to Ika Lestari Adji, Head of Jakarta Housing and Government Building Dept, a number of locations have been proposed, such as Rawa Buaya and Tanah Abang Block G Market depots.

"For worker outside Jakarta, don't worry you don't need to spend your money to go to your home. Because we are now preparing the low-cost flat," she expressed, Thursday (3/17).

City Promises Flat for Under Wiyoto Wiyono Toll Residents

She assessed, the flat construction will take 36 type and its rental cost between Rp2-3 million.

"Flat construction was been scheduled, we hope there is subsidy from the government considering we also need cost for maintaining the flat," she explained.

Not only that, her dept would also indulge disabled people. One of the facilities that will be improved is the provision of a wheelchair. They will also be placed on the first floor to facilitate their activities in parks and other public facilities.

"We also prepare a guide block to the parks and the worship place in the tower. Certainly it must be friendly with disabled," stated Ika.

Thus far, it has been applied in the Tambora Flat such as lift measurement for disabled. And the same thing will also be done to all flats.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye947 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye664 personAldi Geri Lumban Tobing
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye540 personAldi Geri Lumban Tobing
  4. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye538 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye487 personFolmer