You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Crossingan di Depan Hotel Borobudur di Kuras Tata Air Jakpus
.
photo Rudi Hermawan - Beritajakarta.id

2,000 Sacks of Mud Transported from Pejambon Channel

As many as 11 Central Jakarta Water Management Sub-dept officers dredged a water channel on Jl Pejambon, Gambir, precisely in front of Borobudur Hotel. It is targeted to be done in the upcoming June.

We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)

Head of Maintenance Section, Central Jakarta Water Management Sub-dept, Boris Karlip Lumbangaol disclosed The channel was full of mud.

Mud from Channel on Jl Swasembada Timur Cleaned

"We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)," he stated, Sunday (5/22).

He explains, the channel itself has 130 meters long and 140 centimeters wide. 

"We also made a control basin thus dredging does not disturb traffic. Until now, we managed to pick up 2,000 sacks of mud from the channel," he finished.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1148 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye778 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing