You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Crossingan di Depan Hotel Borobudur di Kuras Tata Air Jakpus
.
photo Rudi Hermawan - Beritajakarta.id

2,000 Sacks of Mud Transported from Pejambon Channel

As many as 11 Central Jakarta Water Management Sub-dept officers dredged a water channel on Jl Pejambon, Gambir, precisely in front of Borobudur Hotel. It is targeted to be done in the upcoming June.

We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)

Head of Maintenance Section, Central Jakarta Water Management Sub-dept, Boris Karlip Lumbangaol disclosed The channel was full of mud.

Mud from Channel on Jl Swasembada Timur Cleaned

"We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)," he stated, Sunday (5/22).

He explains, the channel itself has 130 meters long and 140 centimeters wide. 

"We also made a control basin thus dredging does not disturb traffic. Until now, we managed to pick up 2,000 sacks of mud from the channel," he finished.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1041 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye549 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing