You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Crossingan di Depan Hotel Borobudur di Kuras Tata Air Jakpus

2,000 Sacks of Mud Transported from Pejambon Channel

As many as 11 Central Jakarta Water Management Sub-dept officers dredged a water channel on Jl Pejambon, Gambir, precisely in front of Borobudur Hotel. It is targeted to be done in the upcoming June.

We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)

Head of Maintenance Section, Central Jakarta Water Management Sub-dept, Boris Karlip Lumbangaol disclosed The channel was full of mud.

Mud from Channel on Jl Swasembada Timur Cleaned

"We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)," he stated, Sunday (5/22).

He explains, the channel itself has 130 meters long and 140 centimeters wide. 

"We also made a control basin thus dredging does not disturb traffic. Until now, we managed to pick up 2,000 sacks of mud from the channel," he finished.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2403 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1124 personAldi Geri Lumban Tobing
  3. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye871 personFakhrizal Fakhri
  4. Pramono: Jakarta Remains the Capital City Until a Presidential Decree Is Issued

    access_time13-05-2026 remove_red_eye807 personDessy Suciati
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye763 personBudhi Firmansyah Surapati