You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Crossingan di Depan Hotel Borobudur di Kuras Tata Air Jakpus

2,000 Sacks of Mud Transported from Pejambon Channel

As many as 11 Central Jakarta Water Management Sub-dept officers dredged a water channel on Jl Pejambon, Gambir, precisely in front of Borobudur Hotel. It is targeted to be done in the upcoming June.

We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)

Head of Maintenance Section, Central Jakarta Water Management Sub-dept, Boris Karlip Lumbangaol disclosed The channel was full of mud.

Mud from Channel on Jl Swasembada Timur Cleaned

"We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)," he stated, Sunday (5/22).

He explains, the channel itself has 130 meters long and 140 centimeters wide. 

"We also made a control basin thus dredging does not disturb traffic. Until now, we managed to pick up 2,000 sacks of mud from the channel," he finished.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye794 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye704 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye640 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye599 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye448 personDessy Suciati