You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Crossingan di Depan Hotel Borobudur di Kuras Tata Air Jakpus

2,000 Sacks of Mud Transported from Pejambon Channel

As many as 11 Central Jakarta Water Management Sub-dept officers dredged a water channel on Jl Pejambon, Gambir, precisely in front of Borobudur Hotel. It is targeted to be done in the upcoming June.

We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)

Head of Maintenance Section, Central Jakarta Water Management Sub-dept, Boris Karlip Lumbangaol disclosed The channel was full of mud.

Mud from Channel on Jl Swasembada Timur Cleaned

"We have conducted dredging since Friday (5/20) yesterday and is predicted will be complete on Wednesday (6/8)," he stated, Sunday (5/22).

He explains, the channel itself has 130 meters long and 140 centimeters wide. 

"We also made a control basin thus dredging does not disturb traffic. Until now, we managed to pick up 2,000 sacks of mud from the channel," he finished.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1456 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1223 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1018 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye991 personFolmer
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye887 personAldi Geri Lumban Tobing