You don't have javascript enabled. Good luck with that.
Pencarian
Satgas Sudin Tata Air Bongkar Pos Jaga di Jl Dobek
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Connecting Channel & Waterway Built on Jl Dobek Towards Cakung Drain

North Jakarta Water Management Taskforce tore down a security post on Jl Dobek, RW 10, Rorotan Urban Village, Cilincing. It is conducted to smoothen the project of the connecting channel and waterway that connect to Cakung Drain River.

We do this to follow up citizen's request

North Jakarta Water Management Sub-dept Head, Herning Wahyuningsih disclosed the project is citizen request to minimize inundation as high as 30 cm that often hit during rain.

"We do this to follow up citizen's request," she stated, Monday (8/15).

Meruya Indah Connecting Channel Normalized

She continued, the channel would have 350 m long, 2 m wide and 1.5 m deep.

"Besides surrounding environments, the channel can protect Babek TNI Housing Complex from inundation. Such project is targeted to be complete in the upcoming September," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1041 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye550 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing