You don't have javascript enabled. Good luck with that.
Pencarian
Satgas Sudin Tata Air Bongkar Pos Jaga di Jl Dobek

Connecting Channel & Waterway Built on Jl Dobek Towards Cakung Drain

North Jakarta Water Management Taskforce tore down a security post on Jl Dobek, RW 10, Rorotan Urban Village, Cilincing. It is conducted to smoothen the project of the connecting channel and waterway that connect to Cakung Drain River.

We do this to follow up citizen's request

North Jakarta Water Management Sub-dept Head, Herning Wahyuningsih disclosed the project is citizen request to minimize inundation as high as 30 cm that often hit during rain.

"We do this to follow up citizen's request," she stated, Monday (8/15).

Meruya Indah Connecting Channel Normalized

She continued, the channel would have 350 m long, 2 m wide and 1.5 m deep.

"Besides surrounding environments, the channel can protect Babek TNI Housing Complex from inundation. Such project is targeted to be complete in the upcoming September," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1627 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1457 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1321 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1095 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye981 personDessy Suciati