You don't have javascript enabled. Good luck with that.
Pencarian
Satgas Sudin Tata Air Bongkar Pos Jaga di Jl Dobek

Connecting Channel & Waterway Built on Jl Dobek Towards Cakung Drain

North Jakarta Water Management Taskforce tore down a security post on Jl Dobek, RW 10, Rorotan Urban Village, Cilincing. It is conducted to smoothen the project of the connecting channel and waterway that connect to Cakung Drain River.

We do this to follow up citizen's request

North Jakarta Water Management Sub-dept Head, Herning Wahyuningsih disclosed the project is citizen request to minimize inundation as high as 30 cm that often hit during rain.

"We do this to follow up citizen's request," she stated, Monday (8/15).

Meruya Indah Connecting Channel Normalized

She continued, the channel would have 350 m long, 2 m wide and 1.5 m deep.

"Besides surrounding environments, the channel can protect Babek TNI Housing Complex from inundation. Such project is targeted to be complete in the upcoming September," he disclosed.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye910 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye623 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye592 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye584 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye544 personTiyo Surya Sakti