You don't have javascript enabled. Good luck with that.
Pencarian
Sodetan di Kelapadua Wetan Mulai Dipasang

Waterway Development in Kelapa Dua Starts

East Jakarta Water Management starts to develop a waterway under Jl Darussalam, Kelapa Dua Wetan, Ciracas towards Rawa Babon Reservoir, precisely on north side of the sluice gate. It is conducted to overcome inundation during rainy season.

Waterway development has been ongoing since last night. Even water can already be flowed to the waterway

"Waterway development has been ongoing since last night. Even water can already be flowed to the waterway," said Budy Hartati, Head of Kelapa Dua Wetan Urban Village, Tuesday (8/30).

Separately, East Jakarta Water Management Sub-dept Head, Ahmad Yazied Bustomi added, the waterway was deliberately made in diameter of 1 meter thus water from Rawa Babon Reservoir not overflow into the connecting channel. Its development is targeted to be complete in three days.

Connecting Channel & Waterway Built on Jl Dobek Towards Cakung Drain

"If it is made large, the reservoir water can enter all. It is worried will make inundation in other regions. That's why it is only made in diameter of 1 meter," he finished.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye2003 personAldi Geri Lumban Tobing
  2. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye918 personAldi Geri Lumban Tobing
  3. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye815 personFakhrizal Fakhri
  4. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye730 personTiyo Surya Sakti
  5. Malaka Sari Fire Survivors Receive Assistance

    access_time12-06-2026 remove_red_eye563 personNurito