You don't have javascript enabled. Good luck with that.
Pencarian
Wacana Pembuatan Crossing di Jl DI Panjaitan Banyak Kendala

Waterway Project at Jl DI Panjaitan Hampered by Traffic

The planned work of a waterway on Jl DI Panjaitan, precisely in front of Wika Building, East Jakarta encountered obstacles. Dense traffic has led to severe traffic jam when the project runs. 

The impact is, if the waterway is made, it will cause severe traffic jam

"The matter is we have to coordinate with the traffic. Because there is no a protocol lane. The impact is, if the waterway is made, it will cause severe traffic jam," said Yoserizal, Section Head of Maintenance for East Jakarta Water Management Sub-dept, Wednesday (9/28).

According to him, to overcome puddle under Cawang Flyover, there must be waterway. Its length must be 100 meters and width three meters towards Cipinang River. Yet the lane that passed is protocol lane that always crowded every time.

Waterway Development in Kelapa Dua Starts

The waterway is able to overcome puddle in residential at Jl Penegak and Penggalang. Palmerah.

"For waterway on Jl DI Panjaitan, surely must be careful. We have to coordinate with the police and Transportation Dept to discuss about traffic diversion," he told.

Another obstacle is a pipe belongs to PDAM Jaya seen transversely under way. The pipe's water flows from Buaran towards Kalideres.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye829 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye605 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye560 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye549 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye455 personFolmer