You don't have javascript enabled. Good luck with that.
Pencarian
DKI Lengkapi Fasilitas di Terminal Pulo Gebang

Facilities at Pulogebang Terminal Completed

Jakarta Provincial Government is going to complete various supporting facilities at Pulogebang Terminal, East Jakarta. As planned, President, Joko "Jokowi" Widodo will inaugurate terminal on December 20, 2016.

All facilities must be completed, because it will be a pilot for terminal all over Indonesia

City Secretary, Saefullah stated the existing facility must be completed soon, ranging from traffic sign, either inside or outside of terminal, as well as application system that will be used for vehicle operational and kiosk utilization.

"All facilities must be completed, because it will be a pilot for terminal all over Indonesia," he stated, during a executive meeting, at City Hall, Monday (12/5).

Transportation Dept Recommends Revoking 154 AKAP Trajectories

Especially for information technology (IT) matter, he wants the goods provider to be responsible in its function. Because the fund that allocated is high enough, precisely amounting to Rp 13 billion. 

"The goods provider must be responsible, because the system has not been lived. So it should really work. Check it again," he stated.

Meanwhile, Jakarta Transportation Dept Head, Andri Yansyah disclosed there are some facilities that should be completed, such as traffic sign, IT, eligible test for lift and escalator, as well as use of kiosks.

"Especially for traffic sign is still lacking, thus many drivers get lost when going to enter into or exit from terminal. It is a priority," he uttered.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1471 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1158 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye946 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye933 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye847 personDessy Suciati