You don't have javascript enabled. Good luck with that.
Pencarian
Rekayasa Lalin Sekitar Proyek Pembangunan FO dan UP Dievaluasi

Traffic Engineering at Construction Sites Is Evaluated Periodically

Jakarta Transportation Dept. is periodically evaluating traffic engineering system at six spots of flyover and underpass construction.

Each project spot is surely different. Its handling continues to be evaluated periodically

Not only that, additional officers to manage traffic also continues to be intensified which aims to minimize congestion at the construction sites.

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said periodic coordination along with the police is taken to parse congestion at Pancoran Flyover construction in Cipinang Lontar, Bintaro Permai and UP Mampang, Matraman and RA Kartini. The construction pattern is according to the field condition.

Flyover Project, Road at Pancoran Intersection Closed at 11 PM-4 AM

"Each project spot is surely different. Its handling continues to be evaluated periodically," he stated, Saturday (4/22).

He furthered a detour, which means “additional roads using sidewalk” and additional green light duration in each traffic light have been set. There are also six until ten traffic officers alerted to support the police in the field. They will operate in the morning until evening in two shifts.

"During development acceleration and road closure at 11 PM-4 AM, we prepare 20 officers to manage traffic in the field," he finished.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing