You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan PHB Angrek Sudah 75 Persen

Anggrek Channel Has Been Dredged Up to 75 Percent

South Jakarta Water Resource Sub-dept. is dredging an Anggrek connecting channel, Pesanggrahan. Until now, the process has reached 75 percent.

It has been done since mid-April, and now has reached 75 percent

"It has been done since mid-April, and now has reached 75 percent. It's targeted to be finished after Eid ul-Fitr," expressed Firmansyah, Section Head of Maintenance for South Jakarta Water Resource Sub-dept., Wednesday (5/17).

The channel itself has 3-6 meters width. It is dredged up to 1-2 meters depth. "We deploy an excavator to optimize it," he told.

2,000 Sacks of Mud at Perum Peruya IIir Channel Dredged

Yet his side has difficulties to bring it, as the place is pretty dense.

"Acceleration is done for mud removal, as our heavy equipment is rather limited," he closed.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1095 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye950 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye725 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye625 personAnita Karyati