Inlet BMW Park's Sheet Pile Repaired
Reported by Nurito | Translated by Nugroho Adibrata
The Inlet BMW Park's connecting channel sheet pile, Tanjung Priok, North Jakarta are repaired. It is targeted to be completed this week.
Repair itself is done on the left and right of the damaged sheet pile
North Jakarta Water Resources Sub-dept. Head, Santo said, the repair takes 300 meters length. It will be realized through self-managed funds.
Leaked Sheet Piles in Penjaringan will Be Repaired"Repair itself is done on the left and right of the damaged sheet pile," he stated, Wednesday (11/8).
According to him, materials used for sheet pile is river rocks. Later on, the top of the sheet pile will be fitted with a concrete seat belt with a thickness of about 60 centimeters in order to avoid prolonged damage.
"In this sheet pile, a lot of river rocks are dislodged. Surely it will cause collapse someday," he uttered.
Then for the channel itself has 8-10 meters. Water flow in the channel will empty into Cincin Reservoir located on east side of BMW Park, Papanggo Urban Village, Tanjung Priok.