You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran PHB Inlet Taman BMW Diperbaiki

Inlet BMW Park's Sheet Pile Repaired

The Inlet BMW Park's connecting channel sheet pile, Tanjung Priok, North Jakarta are repaired. It is targeted to be completed this week.

Repair itself is done on the left and right of the damaged sheet pile

North Jakarta Water Resources Sub-dept. Head, Santo said, the repair takes 300 meters length. It will be realized through self-managed funds.

Leaked Sheet Piles in Penjaringan will Be Repaired

"Repair itself is done on the left and right of the damaged sheet pile," he stated, Wednesday (11/8).

According to him, materials used for sheet pile is river rocks. Later on, the top of the sheet pile will be fitted with a concrete seat belt with a thickness of about 60 centimeters in order to avoid prolonged damage.

"In this sheet pile, a lot of river rocks are dislodged. Surely it will cause collapse someday," he uttered.

Then for the channel itself has 8-10 meters. Water flow in the channel will empty into Cincin Reservoir located on east side of BMW Park, Papanggo Urban Village, Tanjung Priok.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2430 personTiyo Surya Sakti
  2. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1337 personNurito
  3. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1158 personAldi Geri Lumban Tobing
  4. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye977 personAldi Geri Lumban Tobing
  5. Pramono: Jakarta Remains the Capital City Until a Presidential Decree Is Issued

    access_time13-05-2026 remove_red_eye954 personDessy Suciati