You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran PHB Inlet Taman BMW Diperbaiki

Inlet BMW Park's Sheet Pile Repaired

The Inlet BMW Park's connecting channel sheet pile, Tanjung Priok, North Jakarta are repaired. It is targeted to be completed this week.

Repair itself is done on the left and right of the damaged sheet pile

North Jakarta Water Resources Sub-dept. Head, Santo said, the repair takes 300 meters length. It will be realized through self-managed funds.

Leaked Sheet Piles in Penjaringan will Be Repaired

"Repair itself is done on the left and right of the damaged sheet pile," he stated, Wednesday (11/8).

According to him, materials used for sheet pile is river rocks. Later on, the top of the sheet pile will be fitted with a concrete seat belt with a thickness of about 60 centimeters in order to avoid prolonged damage.

"In this sheet pile, a lot of river rocks are dislodged. Surely it will cause collapse someday," he uttered.

Then for the channel itself has 8-10 meters. Water flow in the channel will empty into Cincin Reservoir located on east side of BMW Park, Papanggo Urban Village, Tanjung Priok.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5574 personBudhi Firmansyah Surapati
  2. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye928 personAldi Geri Lumban Tobing
  3. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye833 personAldi Geri Lumban Tobing
  4. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye816 personAldi Geri Lumban Tobing
  5. Jakarta–Turkey Film Production to Begin Filming in 2027

    access_time22-10-2026 remove_red_eye760 personBudhi Firmansyah Surapati