You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran PHB Inlet Taman BMW Diperbaiki

Inlet BMW Park's Sheet Pile Repaired

The Inlet BMW Park's connecting channel sheet pile, Tanjung Priok, North Jakarta are repaired. It is targeted to be completed this week.

Repair itself is done on the left and right of the damaged sheet pile

North Jakarta Water Resources Sub-dept. Head, Santo said, the repair takes 300 meters length. It will be realized through self-managed funds.

Leaked Sheet Piles in Penjaringan will Be Repaired

"Repair itself is done on the left and right of the damaged sheet pile," he stated, Wednesday (11/8).

According to him, materials used for sheet pile is river rocks. Later on, the top of the sheet pile will be fitted with a concrete seat belt with a thickness of about 60 centimeters in order to avoid prolonged damage.

"In this sheet pile, a lot of river rocks are dislodged. Surely it will cause collapse someday," he uttered.

Then for the channel itself has 8-10 meters. Water flow in the channel will empty into Cincin Reservoir located on east side of BMW Park, Papanggo Urban Village, Tanjung Priok.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1101 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye701 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye670 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye645 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye628 personTiyo Surya Sakti