You don't have javascript enabled. Good luck with that.
Pencarian
 Pemkot Jakbar Berusaha Atasi Genangan di Kebon Jeruk
.
photo istimewa - Beritajakarta.id

West Jakarta Continues to Overcome Inundation in Kebon Jeruk

West Jakarta Water Resources Sub-dept. keeps trying to solve inundation problem at Jalan Patra, Duri Kepa Urban Village and Jalan Harun, Sukabumi Selatan, Kebon Jeruk.

Talk about two pumps with 2,000 liters per second and collapsible pond, its installation is targeted to be completed by the end of this year,

According to Imron, Head of West Jakarta Water Resources Sub-dept., inundation that hit Jalan Patra is triggered by the overflowing waters of the Kebun Raya Connecting Channel.

SDA Dept. Asked to Accelerate Inundation Handling

"Stationary pumps at the channel are not able to suck up water into Sekretaris River. Thus the water spilled out and flooded Jalan Patra," he stated, Monday (11/13). 

His side also has alerted five mobile pumps with 150-200 liters per second in order to suck up inundation on Jalan Patra.

To solve it totally, his side makes a 12 x 4-meter collapsible pond as deep as four meters and installs two stationary pumps with 1,000 liters per second capacity.

"Talk about two pumps with 2,000 liters per second and collapsible pond, its installation is targeted to be completed by the end of this year," he expressed.

As for the inundation on Jalan Harun, Sukabumi Selatan Urban Village, he assessed, is triggered by unfinished normalization of Sekretaris River. 

He added flood handling in Sukabumi Selatan is still constrained by land acquisition for the normalization project.

"We have proposed the land acquisition owned by residents realized in 2018 for the normalization of Sekretaris River," he finished.

West Jakarta Water Resources Sub-dept. keeps trying to solve inundation problem at Jalan Patra, Duri Kepa Urban Village and Jalan Harun, Sukabumi Selatan, Kebon Jeruk.

According to Imron, Head of West Jakarta Water Resources Sub-dept., inundation at Jalan Patra is mostly triggered by overflowing waters of the Kebun Raya Connecting Channel.

"Stationary pumps at the channel are not able to suck up water into Sekretaris River. Thus the water spilled out and flooded Jalan Patra," he stated, Monday (11/13). 

His side also has alerted five mobile pumps with 150-200 liters per second in order to suck up inundation on Jalan Patra.

To solve it totally, his side makes a 12 x 4-meter collapsible pond as deep as four meters and installs two stationary pumps with 1,000 liters per second capacity.

"Talk about two pumps with 2,000 liters per second and collapsible pond, its installation is targeted to be completed by the end of this year," he expressed.

As for the inundation on Jalan Harun, Sukabumi Selatan Urban Village, he assessed, is triggered by unfinished normalization of Sekretaris River. 

He added flood handling in Sukabumi Selatan is still constrained by land acquisition for the normalization project.

"We have proposed the land acquisition owned by residents realized in 2018 for the normalization of Sekretaris River," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1067 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye952 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye815 personBudhi Firmansyah Surapati
  5. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye770 personAldi Geri Lumban Tobing