You don't have javascript enabled. Good luck with that.
Pencarian
Kantor Lurah Pengadegan Jadi Tempat Pengungsian

Pengadegan Urban Village Office Used as Refugee Camp

RT 05, 06 and 07 are located in the basin. So they are still flooded

Up to now, three RTs in Pengadegan Urban Village, South Jakarta are still flooded. Even, because of many people who fled, the local urban village office had to be also used as a refugee camp.

Pengadegan Urban Village Head, Muhammad Mursid disclosed some areas that are still flooded as high as 20-90 centimeters nowadays are RT 05, 06 and 07/RW 01. That is why the residents decided to take refuge.

1,596 Tons of Trash Collected From Ciliwung River

"RT 05, 06 and 07 are located in the basin. So they are still flooded," he expressed, at his office, Wednesday (2/7).

Because of the office location near residential areas, Mursid stated, his office had to be used as a refugee camp and flood post. It is set up at four points.

Those four points are Pengadegan Urban Village Office, SDN 03 Pengadegan, Pancoran Sub-district Office and Madrasah.

"Until this afternoon, there are still 1,094 people who fled at the four points," he told.

According to him, the supply of logistics in the urban village is fairly enough. The public kitchen that has been set up is capable of making 500 meals. His party gets packaged rice meal from the Indonesian Red Cross (PMI).

"We get aid from related SKPD and sub-district," he told.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye823 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye573 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye566 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye547 personFakhrizal Fakhri