You don't have javascript enabled. Good luck with that.
Pencarian
“32 unit KRL ini merupakan tahap awal dalam pengadaan tahun 2014,” jelasnya, Sabtu (12/7).

32 New Commuter Line Trains Arrived at Pasoso Station

The high demand for transportation among Jakarta residents and its surrounding areas, making PT KAI Jabodetabek bought 176 new units of commuter line train type 205 from the East Japan Railway Company. From 176 units, 32 out of them have arrived due to gradual shipment.

Those trains are an initial stage in the train procurement this year

Communication Manager of PT KAI Jabodetabek Company, Eva Chairunisa disclosed as the initial stage, as many as 32 units have already arrived at the Pasoso Station, Tanjung Priok Port, North Jakarta, Friday (7/11) evening. "Those trains are an initial stage in the train procurement this year," he stated, Saturday (7/12).

He added that if there is no problem on ships transport, 30 units can be done in each shipment. By so, the shipment up to four stages can be expedited.

June 1, Jabodetabek KRL's Itinerary Added

According to her, the trains type 205 are different with type 205 where the formation is less than before. "The difference is in formation, train type 205 has 10 carriages compared to previous train only has 8 carriages," she added.

Chairunisa furthered, the trains were planned to be sent to the Yasa Manggarai Hall for assembly. Today or Saturday (7/12), 12 out of them have been sent and 20 others are still at the Pasoso Station, North Jakarta, and will be sent at 2 PM. 

Linked News
Popular News indeks
  1. Jakarta Unites for a Massive 'Clean Sweep' Across All Districts

    access_time07-02-2026 remove_red_eye1757 personBudhi Firmansyah Surapati
  2. Jakarta's Planning must Be Functional and Environmentally Friendly

    access_time06-02-2026 remove_red_eye1095 personFakhrizal Fakhri
  3. Rano Tees Off the 8th INFOBANK Green Golf Tournament

    access_time07-02-2026 remove_red_eye747 personBudhi Firmansyah Surapati
  4. Jakarta Coastal Areas on Alert for Possible Tidal Flood

    access_time11-02-2026 remove_red_eye729 personAldi Geri Lumban Tobing
  5. Monorail Pole Demolition must Be Accelerated, Pramono Says

    access_time06-02-2026 remove_red_eye600 personDessy Suciati