You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Diuji Coba Dari Stasiun Velodrome ke Stasiun Boulevard

LRT Trialled from Velodrome Station towards Kelapa Gading

This trial is done twice in a day, precisely first trip at 3-4 PM and second trip at 4-5 PM

PT Light Rail Transit (LRT) Jakarta today is conducting an operation trial of four LRT train cars. Operation trial is carried out from the Velodrome station to the North Boulevard station.

Jakarta LRT Train Tested Operating

Besides him, there were also PT Jakarta Propertindo (Jakpro) President Director, Dwi Wahyu Darwoto; President Director of PT LRT Jakarta, Allan Tandiono; and Head of Jakarta Transportation Dept., Andri Yansyah.

"This trial is conducted to ensure the train is running well and of course on time," expressed Allan Tandiono, President Director of PT LRT Jakarta, Wednesday (9/12).

He explained that the limited trial time from Rawamangun Velodrome station to Kelapa Gading LRT station is in accordance with the trip time planning, which is 12 minutes.

Similarly, central operational control has been running well.

"The train runs at a speed of 15 kilometers per hour when turning and speed of 40 kilometers per hour when running straight," he stated.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye844 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye712 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati