You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Diuji Coba Dari Stasiun Velodrome ke Stasiun Boulevard

LRT Trialled from Velodrome Station towards Kelapa Gading

This trial is done twice in a day, precisely first trip at 3-4 PM and second trip at 4-5 PM

PT Light Rail Transit (LRT) Jakarta today is conducting an operation trial of four LRT train cars. Operation trial is carried out from the Velodrome station to the North Boulevard station.

Jakarta LRT Train Tested Operating

Besides him, there were also PT Jakarta Propertindo (Jakpro) President Director, Dwi Wahyu Darwoto; President Director of PT LRT Jakarta, Allan Tandiono; and Head of Jakarta Transportation Dept., Andri Yansyah.

"This trial is conducted to ensure the train is running well and of course on time," expressed Allan Tandiono, President Director of PT LRT Jakarta, Wednesday (9/12).

He explained that the limited trial time from Rawamangun Velodrome station to Kelapa Gading LRT station is in accordance with the trip time planning, which is 12 minutes.

Similarly, central operational control has been running well.

"The train runs at a speed of 15 kilometers per hour when turning and speed of 40 kilometers per hour when running straight," he stated.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1722 personDessy Suciati
  2. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye480 personDessy Suciati
  3. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye454 personDessy Suciati
  4. No Damage Reported Following Magnitude 5.9 Seribu Islands Quake

    access_time12-09-2026 remove_red_eye449 personBudhi Firmansyah Surapati
  5. Ketapang TPS 3R Processes 13 Tons of Waste from Duri Pulo and Petojo Utara

    access_time11-09-2026 remove_red_eye434 personFolmer