You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Jakarta Diuji Operasi
.
photo Wuri Setyaningsih - Beritajakarta.id

LRT Train Operation Tested

Yesterday, PT. Light Rail Transit (LRT) Jakarta tested four LRT train cars. Testing was held from Velodrome Station to Boulevard Utara Station.

This operation test is done twice a day

PT. LRT Jakarta President Director, Allan Tandiono stated, train testing was done by involving Jakarta Goods/Services Procurement Policy Institutions (LKPP). His side will do similar tests until next September.

"This operation test is done twice a day. First trip at 3-4 PM and second trip at 4-5 PM. One trip can accommodate 100 people maximum," he informed, Wednesday (8/29).

PT LRT Jakarta to Explore Retail and Ad Business

In this trial, train was run by machinist with maximum speed 40 kilometers per hour at a straight track and 25 kilometers per hour at cornering track.

Train will be operated this December and hopefully people to choose it as alternative transportation.

"Currently it is still run by two machinists, junior and senior machinists, under Operation Control Center (OCC) monitoring," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye350 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik