You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Jakarta Diuji Operasi

LRT Train Operation Tested

Yesterday, PT. Light Rail Transit (LRT) Jakarta tested four LRT train cars. Testing was held from Velodrome Station to Boulevard Utara Station.

This operation test is done twice a day

PT. LRT Jakarta President Director, Allan Tandiono stated, train testing was done by involving Jakarta Goods/Services Procurement Policy Institutions (LKPP). His side will do similar tests until next September.

"This operation test is done twice a day. First trip at 3-4 PM and second trip at 4-5 PM. One trip can accommodate 100 people maximum," he informed, Wednesday (8/29).

PT LRT Jakarta to Explore Retail and Ad Business

In this trial, train was run by machinist with maximum speed 40 kilometers per hour at a straight track and 25 kilometers per hour at cornering track.

Train will be operated this December and hopefully people to choose it as alternative transportation.

"Currently it is still run by two machinists, junior and senior machinists, under Operation Control Center (OCC) monitoring," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close