You don't have javascript enabled. Good luck with that.
Pencarian
Hari Ini, Kereta LRT Jakarta Diuji Operasi
.
photo Wuri Setyaningsih - Beritajakarta.id

LRT Train Operation Tested

Yesterday, PT. Light Rail Transit (LRT) Jakarta tested four LRT train cars. Testing was held from Velodrome Station to Boulevard Utara Station.

This operation test is done twice a day

PT. LRT Jakarta President Director, Allan Tandiono stated, train testing was done by involving Jakarta Goods/Services Procurement Policy Institutions (LKPP). His side will do similar tests until next September.

"This operation test is done twice a day. First trip at 3-4 PM and second trip at 4-5 PM. One trip can accommodate 100 people maximum," he informed, Wednesday (8/29).

PT LRT Jakarta to Explore Retail and Ad Business

In this trial, train was run by machinist with maximum speed 40 kilometers per hour at a straight track and 25 kilometers per hour at cornering track.

Train will be operated this December and hopefully people to choose it as alternative transportation.

"Currently it is still run by two machinists, junior and senior machinists, under Operation Control Center (OCC) monitoring," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye559 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye454 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye310 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye302 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti