You don't have javascript enabled. Good luck with that.
Pencarian
Sepanjang Tahun 2018, Bank Sampah Tidung Bersih Hasilkan Rp 18 Juta

January-December, Tidung Bersih Waste Bank Collects Rp 18 M

Along January-December 2018, the Tidung Bersih waste bank, Tidung Island Urban Village, South Seribu Island, managed to produce 8,899 kilograms of waste or equivalent to Rp 18 million.

It's hoped that the residents and officers will be more active in collecting waste in the waste bank, as the results directly or indirectly have now felt

Tidung Island Urban Village Head, Cecep Suryadi expressed that waste bank is managed by PPSU. The waste itself is collected from customers who come from schools and local residents comprising, bottles and plastic cups of drinking water packaging, cardboard, paper, metal, aluminum and iron.

"It's hoped that the residents and officers will be more active in collecting waste in the waste bank, as the results directly or indirectly have now felt," he expressed, Thursday (12/6).

S. Jakarta Cooperates with Osaki City to Manage Waste

After collected, the waste will be sold to a big waste bank with a variety of prices depending on the type of waste from Rp 2,000 per kilogram, henceforth taken to land.

"Customers can take the money at least after four times saving waste, yet most customers take their money after 2-3 months of saving waste," he uttered.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1307 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1157 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye938 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye892 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye844 personDessy Suciati