You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di Jl BGR Rampung Sepekan

Retention Pond to Minimize Puddles on Jalan Bukit Gading Raya

A retention pond or locally known as kolam olakan is planned to be built at Jalan Bukit Gading Raya (BGR), Kelapa Gading Barat Urban Village, Kelapa Gading in the near future. 

This is part of an effort to overcome flood puddles problem on Jalan Buking Gading Raya and Jalan Boulevard Barat Kelapa Gading

"This is part of an effort to overcome flood puddles on Jalan Buking Gading Raya and Jalan Boulevard Barat Kelapa Gading. With this pond, rainwater can be accommodated," expressed Kelapa Gading Sub-district Executing Unit Head, Rukmana, Friday (3/8).

Inundation-control Projects in Kelapa Gading Intensified

The pond along Jalan Bukit Gading Raya will be made on the west ad east parts of the street and the other one will be on the west side of the south end of the street. 

Even portable pump will be placed in each location when it rains.

Each pond has sizes between 2x1 to 2x3 meters with two meters depth.

"It is targeted to be completed within a week ahead," he said.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1655 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye666 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye423 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye392 personDessy Suciati