You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Kolam Olakan di Jl BGR Rampung Sepekan

Retention Pond to Minimize Puddles on Jalan Bukit Gading Raya

A retention pond or locally known as kolam olakan is planned to be built at Jalan Bukit Gading Raya (BGR), Kelapa Gading Barat Urban Village, Kelapa Gading in the near future. 

This is part of an effort to overcome flood puddles problem on Jalan Buking Gading Raya and Jalan Boulevard Barat Kelapa Gading

"This is part of an effort to overcome flood puddles on Jalan Buking Gading Raya and Jalan Boulevard Barat Kelapa Gading. With this pond, rainwater can be accommodated," expressed Kelapa Gading Sub-district Executing Unit Head, Rukmana, Friday (3/8).

Inundation-control Projects in Kelapa Gading Intensified

The pond along Jalan Bukit Gading Raya will be made on the west ad east parts of the street and the other one will be on the west side of the south end of the street. 

Even portable pump will be placed in each location when it rains.

Each pond has sizes between 2x1 to 2x3 meters with two meters depth.

"It is targeted to be completed within a week ahead," he said.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1074 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye595 personBudhi Firmansyah Surapati
  3. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye484 personDessy Suciati
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye481 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye470 personFakhrizal Fakhri