You don't have javascript enabled. Good luck with that.
Pencarian
Eskalator Blok G Tanah Abang Siap Dioperasikan Akhir Bulan Ini
Eskalator Blok G Tanah Abang Siap Dioperasikan Akhir Bulan Ini .
photo Andry - Beritajakarta.id

Tanah Abang Blok G Market Escalator Operated This Month

The escalator built in Tanah Abang Blok G Market, Central Jakarta, will soon be operated by the end of this month. Other works involving supporting facilities, like installing glass covers on the side of the escalator and tiles on ground floor, will be done this week.

The escalator from ground floor until third floor has been tested since last week, and there is no problem. This end of August we’ll operate it

“The escalator from ground floor until third floor has been tested since last week, and there is no problem. This end of August we’ll operate it. Other works left are only finishing,” stated Tanah Abang Blok G Market, Namen Suhandi, Monday (8/25).

Besides building escalator, Suhandi continued, Jakarta Transportation Department is also trying to build pedestrian crossing bridge (JPO) from Tanah Abang Station to Tanah Abang Blok G Market.

Danau Sunter Bridge Unrepaired, Motorists Protest

“Two weeks ago we held meeting with Jakarta Transportation Department about the JPO. They were targeting the JPO to be functioned by the end of next year,” he said.

According to Suhandi, the JPO would be 325 meters long and three meters wide. And at the same time, another bridge would also be operated by PD Pasar Jaya. Later, the bridge will connect Blok G Market with Blok F Market.

“The bridge connecting Blok G Market with Blok F Market is still being done by PD Pasar Jaya. It is targeted to be operated with the JPO connecting Blok G Market with Tanah Abang Station. In the future all shopping centers in Tanah Abang would be connected, starting from Blok G, Blok F, Blok C, Blok B, Blok A, and Metro,” he uttered.

Rita (42), a clothes vendor in Blok G Market third floor, hopes the market management would quickly finish the escalator finishing works and accelerate the construction of connecting bridge to Tanah Abang Station.

“It’s good if the escalator operated quick, so people would be easier getting up here and not fatigue. And speed the construction works. We’re about to sink in here,” she expressed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye551 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing