You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Phb Jalur Elok Raya Dikeruk

Connecting Channel on Jalan Janur Elok Raya Dredged

Our completion tar get is in early September

A connecting channel on Jalan Elok Raya, RW 06, Kelapa Gading Barat Urban Village, Kelapa Gading is dredged in order to prevent inundation when it rains.

Connecting Channel Built in Untung Jawa Island

Kelapa Gading Sub-district Executing Unit Head, Rukmana said that the channel that has 1,350 meters length with 8 meters width often overflows during rain season. 

"We will deepen around 1.5-2 meters from the existing one," he stated, Wednesday (8/14).

It has been carried out since last week by sending one excavator and seven dump trucks to transport mud.

"Our completion target is in early September," he said.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye953 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye607 personDessy Suciati
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye592 personAldi Geri Lumban Tobing
  4. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye565 personAldi Geri Lumban Tobing
  5. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye549 personDessy Suciati
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved