Connecting Channel on Jalan Janur Elok Raya Dredged
access_time August 14 2019 05:34 PM remove_red_eye 1642
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
Our completion tar get is in early September
A connecting channel on Jalan Elok Raya, RW 06, Kelapa Gading Barat Urban Village, Kelapa Gading is dredged in order to prevent inundation when it rains.Connecting Channel Built in Untung Jawa Island
Kelapa Gading Sub-district Executing Unit Head, Rukmana said that the channel that has 1,350 meters length with 8 meters width often overflows during rain season.
"We will deepen around 1.5-2 meters from the existing one," he stated, Wednesday (8/14).
It has been carried out since last week by sending one excavator and seven dump trucks to transport mud.
"Our completion
target is in early September," he said.
Linked News
-
Kelapa Hibrida PHB Channel Dredged to Anticipate Inundation
access_timeKamis, 01 Agustus 2019 11:43 WIB
remove_red_eye873 personBudhi Firmansyah Surapati -
Connecting Channel on Jalan Mayjen Soetoyo Dredged
access_timeKamis, 10 Januari 2019 12:38 WIB
remove_red_eye1158 personNurito
Popular News
indeks